A part of the scheme would be the construction of a six platform underground station at Broad Green where the two loops and the St.Helens/Wigan line met. Upon re-tendering, Northern Rail failed to retain the contract, and it passed to Arriva Rail North from 1 April 2016. Designed with features to help you plan your journey and keep you in the loop as you travel door to door. Two services are not electrified, the Manchester via Warrington Central and Chester via Runcorn. The loop would also be split into two loops, one north and one south of Liverpool's city centre, heading for the city centre's Central Station from Broad Green in the east via the Edge Hill Junction. This tunnel, known as the Liverpool Link Line, utilised part of the former Liverpool Central to James Street Mersey Railway tunnel plus some new single track tunnels. In the 1960s during the planning for Merseyrail, this was developed into the Outer Rail Loop scheme - an electric rapid-transit passenger line circling the outer districts of the city by using a combination of newly electrified existing lines and a new link tunnel under the city centre merging lines to the north and south of the city centre completing the loop. The electrification extending Merseyrail through to Wigan Wallgate was a long-term aspiration of Merseytravel in 2014 being identified by Network Rail as a route where electrification would enable new patterns of passenger service to operate. Welsh Economy Secretary, Ken Skates, stated that the Welsh government were in an advanced stage of talks with Merseytravel about running a direct service from Wrexham to Liverpool. All trains are being phased out in favour of the class 777 trains. The City Line, shown in red on the Merseyrail map, is a term used by local transport authority Merseytravel to describe the suburban/regional services which depart from the mainline surface platforms at Liverpool Lime Street on the Liverpool–Wigan line, the two routes of the Liverpool–Manchester lines, the Liverpool-Crewe Line, Liverpool-Chester line via Runcorn and the Liverpool-Blackpool line.

[67] Bi-modal battery/electric trains are to be trialled by Merseyrail on some sections of Merseyrail.

A burrowing junction was constructed at Birkenhead Hamilton Square station, to increase traffic capacity on the Wirral Line by eliminating the flat junction to the west of the station. These sub-loops allowed more direct journeys to the city centre from the eastern suburbs giving the overall scheme greater viability.

Merseyrail and Northern Rail trains are generally timed to meet for ease of interchange. [2][4], In August 2009, the Liverpool Daily Post reported that a new tram-train link to Liverpool John Lennon Airport and a link to Kings Dock from the east of the city, had been proposed.[5]. All rights reserved. It allowed interchange between the Merseyrail Northern Line services with the City Line and main line services from Lime Street. However, when the cost was estimated at £207 million,[11] Merseytravel announced that cheaper overhead line electrification would be considered instead. At Trainline, we'll show you where Merseyrail can take you and how to book the best value fares for your journey. to create your own account! Travelling with Merseyrail? However, in 2017 the Department for Transport announced that electrification of lines in Britain will only be where necessary with some planned projects cancelled. Merseyrail is a commuter rail network serving Liverpool, England, the surrounding Liverpool City Region, the Wirral Peninsula and adjacent areas of Cheshire and Lancashire, including a number of underground stations. Con – the present logo is well known and is shorthand for Metro worldwide as other systems employ the M symbol. The Link Line tunnel is a double-track tunnel that links two lines. Kirkby station became the terminal of the Northern Line Kirkby branch. Your interactive, shareable online planner & guide to great days out.

From kids to elderly people, there are great discounts out there to be had. Unsure about where to start your adventure?

[2] In November 2009, the Liverpool Daily Post reported that Merseyrail is in talks to add three further trains to its fleet to boost rush-hour capacity, with rolling stock that is currently part of London Overground. Got a query about your Merseyrail journey? If realised Burscough Junction, Burscough Bridge, New Lane, Bescar Lane and Meols Cop stations may be incorporated into Merseyrail. The eastern section of the Outer Rail Loop project was cancelled in the late 1970s because of delays and cost overruns on the Loop (Wirral Line) and Link (Northern Line) projects and local political opposition. The Merseyrail Network Edit File:Merseyrail Map.svg. In the decades following the commissioning of the resulting cut down rapid-transit network, political moves were made to complete the full project, to fully incorporate the City Line into the network, however to no avail.

Take your favorite fandoms with you and never miss a beat. [51] In March 2015 the Electrification Task force placed electrifying the line from Liverpool to Manchester via Warrington Central in the Tier 1 priority category. At Ellesmere Port there is a minimal service to and from Warrington.[12]. Welcome to TheFutureOfEuropes Wikia! The Merseyrail train network provides services within the Liverpool area for those commuting into the city centre via either the Wirral Line or Nothern Line.