The neighborhood was planned to be pedestrian-friendly, and there were no at-grade parking. The main floor consists of three activity zones: the Ice Zone consists of two ice hockey rinks with international dimensions, the Court Zone consists of ten basketball courts and the Track Zone consists of a five-lane 200-meter (660 ft) oval running track and a five-lane 110-meter (360 ft) sprint track. The challenge is to find free parking near the Oval. [8] The legacy plans for the venue were to convert it to a multi-sports park, with the speed skating track being removed. A December 2005 report found that this was not sufficient, resulting in franki piles also being installed. [2], Two months after being awarded the games on 2 July 2003, the responsibility for planning the Olympics were transferred to the Vancouver Organizing Committee for the 2010 Olympic and Paralympic Winter Games (VANOC). What you need to know for your next visit to the Richmond Olympic Oval. Olympic Oval to participate in its Olympic Experience. As I am a huge fan of the Olympic Games, I recently went to the Richmond, B.C. Chris Giacomantonio, president of the Simon Fraser Student Society, stated that he was opposed to the project, as the university's contribution would give little benefit for students. The fastest ice is measured by comparing the accumulative rink records of Olympic disciplines. [11] Project management was contracted to MHPM Project Managers, construction manager was Dominion Fairmile Construction and structural engineers were Fast + Epp and Glotman Simpson, with the former responsible for the roof structure and façade and the latter for the base building. [3], Two formal proposals were submitted: one from Richmond and a revised bid from SFU. [24], Major post-Olympic events include the 2010 World Wheelchair Rugby Championships, the 2011 World Masters Badminton Championships and 2012 ISKF National Karate Championship. [14], Construction required the pouring of 335,280 cubic meters (11,840,000 cu ft) of concrete, the use of 5,600 tonnes of steel and 305 board-kilometers (one million board-feet) of pine beetle wood. The sculpture is made of Tenara architectural fibre, supported by painted galvanized steel rings. A 91-meter (300 ft) boardwalk weaves through the pond and two 16-meter (52 ft) pedestrian bridges cross the pond to reach the Olympic Oval. All the staff on the third floor were very knowledgeable.
Wow its a great place and a lot thing to do. InterContinental (IHG) Hotels in Richmond, Hotels near Steveston Heritage Fishing Village, Hotels near Gulf of Georgia Cannery National Historic Site, Hotels near International Buddhist Society (Buddhist Temple), Hotels near Britannia Shipyards National Historic Site, Hotels near Terra Nova Adventure Play Environment, Hotels near Tourism Richmond Visitor Centre, Points of Interest & Landmarks in Richmond, Conference & Convention Centers in Richmond, International Buddhist Society (Buddhist Temple), Gulf of Georgia Cannery National Historic Site Tickets, McArthurGlen Designer Outlet Vancouver Airport, Britannia Shipyards National Historic Site. Free Richmond Olympic Experience admission. The venue has since been reconfigured and now serves as a community multi-sport park and includes two ice hockey rinks, two running tracks, a climbing wall, a rowing tank and a flexible area which can be used for, among other sports, basketball, volleyball, indoor s… Construction began with the compressing of the ground, which included bolstering two thousand columns of rock down 26 meters (85 ft) and the piling of 100,000 cubic meters (3,500,000 cu ft) of sand on the site. Environmental design includes the capture of rain water on the roof and the recycling of waste heat energy from the refrigeration system for the ice surfaces. [9] VANOC announced on 17 August 2004 that they had selected Richmond as the site of the Olympic oval. 1 778-296-1400 To minimize the risk of flooding, the height of the dike between the venue and the river was raised from 3 to 6 meters (10 to 20 ft). [22], The roof won the 2009 Structural Awards Award for Sports or Leisure Structures. He is a keeper. In addition to speed skating at the 2010 Winter Olympics, the venue has hosted the 2009 World Single Distance Speed Skating Championships. To finance this, $1.9 million was cut by reducing the building's width by 4.5 meters (15 ft). [25], The oval is within walking distance of Lansdowne Station on the SkyTrain's Canada Line.
It was a really fun and interactive experience. The upper level consists of a fitness center with views of the North Shore mountains and the river and houses more than 200 pieces of equipment. The Olympic bid called for the oval to be located on the grounds of Simon Fraser University (SFU) in Burnaby, but Richmond was instead selected in 2004.
Thanks to the gentleman in the wheelchair, sorry I. forgot his name.
Wow its a great place and a lot thing to do. InterContinental (IHG) Hotels in Richmond, Hotels near Steveston Heritage Fishing Village, Hotels near Gulf of Georgia Cannery National Historic Site, Hotels near International Buddhist Society (Buddhist Temple), Hotels near Britannia Shipyards National Historic Site, Hotels near Terra Nova Adventure Play Environment, Hotels near Tourism Richmond Visitor Centre, Points of Interest & Landmarks in Richmond, Conference & Convention Centers in Richmond, International Buddhist Society (Buddhist Temple), Gulf of Georgia Cannery National Historic Site Tickets, McArthurGlen Designer Outlet Vancouver Airport, Britannia Shipyards National Historic Site. Free Richmond Olympic Experience admission. The venue has since been reconfigured and now serves as a community multi-sport park and includes two ice hockey rinks, two running tracks, a climbing wall, a rowing tank and a flexible area which can be used for, among other sports, basketball, volleyball, indoor s… Construction began with the compressing of the ground, which included bolstering two thousand columns of rock down 26 meters (85 ft) and the piling of 100,000 cubic meters (3,500,000 cu ft) of sand on the site. Environmental design includes the capture of rain water on the roof and the recycling of waste heat energy from the refrigeration system for the ice surfaces. [9] VANOC announced on 17 August 2004 that they had selected Richmond as the site of the Olympic oval. 1 778-296-1400 To minimize the risk of flooding, the height of the dike between the venue and the river was raised from 3 to 6 meters (10 to 20 ft). [22], The roof won the 2009 Structural Awards Award for Sports or Leisure Structures. He is a keeper. In addition to speed skating at the 2010 Winter Olympics, the venue has hosted the 2009 World Single Distance Speed Skating Championships. To finance this, $1.9 million was cut by reducing the building's width by 4.5 meters (15 ft). [25], The oval is within walking distance of Lansdowne Station on the SkyTrain's Canada Line.
It was a really fun and interactive experience. The upper level consists of a fitness center with views of the North Shore mountains and the river and houses more than 200 pieces of equipment. The Olympic bid called for the oval to be located on the grounds of Simon Fraser University (SFU) in Burnaby, but Richmond was instead selected in 2004.
Thanks to the gentleman in the wheelchair, sorry I. forgot his name.